A current transformer (CT) reproduces primary-circuit current as a smaller, proportional signal for meters, protective relays, or control equipment. In switchgear, selecting a CT is not just a matter of choosing a ratio: its accuracy, burden, physical fit, wiring, and intended protection function must work together. Understanding those details helps specify new equipment that provides useful measurements and dependable protection.
What a current transformer does
A CT has a primary winding or magnetic core coupled to a secondary winding. The primary carries the circuit current; the secondary delivers a reduced current signal to connected instruments. A ratio such as 800:5 means that, under the specified conditions, 800 amperes on the primary corresponds to 5 amperes on the secondary. A 1-ampere secondary is another common interface. The correct choice depends on the connected device and the expected operating range, not simply on the switchgear’s nominal voltage.
CTs may be installed around a conductor, incorporated into a bus arrangement, or positioned at another defined point in the assembly. That location determines what current is measured and can affect protection zones and wiring routes. A CT used for a feeder meter may serve a different purpose from one assigned to an overcurrent relay or differential-protection scheme. The drawings should identify each CT’s location, polarity, ratio, secondary rating, and destination so that the equipment design and protection documentation agree.
Ratio, accuracy, and burden must work together
Ratio selection should reflect expected load, possible overload, and the measurement or relay input range. A ratio chosen too high can make ordinary operating current a small fraction of the CT’s range, reducing useful resolution for some metering applications. A ratio chosen too low may reach its limits during heavy load or fault conditions. These tradeoffs call for review of actual load information and the protective-device requirements rather than an assumption based on bus rating alone.
Burden is the electrical load imposed on a CT secondary, commonly expressed in volt-amperes at a stated power factor. It includes the connected meter or relay input and the effect of secondary leads and terminals. Excessive burden can compromise performance, while accuracy requirements differ between measurement and protection applications. Specify the required accuracy class and applicable performance requirements for the intended function, then have the CT and connected circuit checked together. Do not assume that a ratio by itself establishes suitable accuracy.

Illustrative application: a feeder with metering and protection
Consider a hypothetical low-voltage switchboard feeder with a meter and an overcurrent protective device. The meter needs a CT signal suited to the expected load range; the protective function needs CT performance appropriate to the relay or trip-device scheme. Depending on the design, one CT set may serve both functions, or separate CTs may be specified. The arrangement must account for each device’s input, required accuracy, wiring burden, and the consequences of a CT issue affecting more than one function.
For a custom new assembly, the purchaser should provide the one-line diagram, system nominal voltage, feeder and bus current information, protective-device details, metering requirements, and the CT schedule or design criteria. Include secondary current preference, required ratios, accuracy or protection class, burden assumptions, polarity and terminal requirements, and the intended connection points. These inputs let the manufacturer review fit and interfaces; final selections remain subject to engineering review and confirmation for the specific order.
Secondary-circuit safety and common misunderstandings
A CT secondary requires careful design and qualified handling. When primary current is flowing, an open secondary can produce hazardous voltage and may damage the CT or connected equipment. CT circuits therefore require suitable shorting provisions and controlled procedures for testing, maintenance, or instrument removal. This is not a task for unqualified personnel, and no work should be performed on energized equipment without appropriate qualifications, authorization, and safe work controls.
A frequent misunderstanding is that a CT behaves like a voltage transformer or can simply be disconnected like an ordinary sensor. Its operating behavior and open-secondary hazard make that assumption unsafe. Another error is treating the CT ratio as the only specification. A correctly labeled ratio cannot compensate for excessive burden, incorrect polarity, an unsuitable accuracy requirement, or a mismatch with the relay input. Drawings and terminal markings should make the secondary circuit and intended connections unambiguous.
Ratings, interfaces, and documentation for a new order
CT selection is tied to the equipment’s electrical and mechanical design. Confirm the system nominal voltage separately from the switchgear’s applicable equipment maximum rating, and verify insulation, fault-duty, short-circuit, and coordination requirements for the complete assembly. A CT’s own ratings and performance must suit its application; the switchgear voltage class alone does not establish that suitability. Component availability, standards requirements, and any U.S.-origin requirements also need confirmation for the particular order.
Useful submittal information includes CT schedules, wiring diagrams, terminal plans, device input data, and the basis for ratio and accuracy selection. Review these against the one-line and protection documentation before release, and preserve the approved information for commissioning and future maintenance. A manufacturer building new custom equipment can use complete project inputs to develop an assembly and pursue shorter lead time as a goal, but timing, components, ratings, and applicable standards must be confirmed rather than assumed. UL 891 applies to low-voltage switchboards when applicable; it is not a general certification for medium-voltage switchgear.
Related terms and regional project coordination
Related terms help clarify a CT specification. A potential transformer, often called a voltage transformer, provides a reduced voltage signal rather than a current signal. Burden describes the load on the CT secondary, while polarity identifies the relative direction of primary and secondary current references. Ratio states the transformation relationship, and accuracy class indicates performance under specified conditions. These terms should be used consistently across drawings, device schedules, and procurement documents.
For projects in Dallas–Fort Worth or elsewhere in the United States, a complete CT schedule is especially useful when equipment must coordinate with existing metering or protection interfaces. Provide the required delivery destination and project documentation with the quote request, but do not infer that regional service means a local manufacturing facility or installation service. Equipment configurations and shipping arrangements are order-specific. A clear application description allows the manufacturer to review the requested new assembly and identify information that needs engineering confirmation.
Specifications & planning
Review the details that matter for your application. Final specifications and availability should be confirmed for your project.
| Evaluation factor | What to confirm |
|---|---|
| Ratio and secondary | Expected current range; connected meter or relay input |
| Burden and accuracy | Device input, lead circuit, and application-specific performance |
| Protection interface | CT location, polarity, terminal plan, and protective-device scheme |
| Order documentation | One-line, CT schedule, system data, and project-specific requirements |