Motor Control Center in Switchgear: Definition and Application

Learn how a motor control center groups motor starters, common bus, and controls, and what ratings, interfaces, and documents to confirm before specifying one.

MADE IN USAAmerican components
UL 891Switchboard assemblies
SHORT LEAD TIMESConfirm your project schedule
BUILT FOR YOUR PROJECT

Power distribution, with purpose.

A motor control center (MCC) is a coordinated assembly that groups motor-control units and related components along a common bus, providing a defined point for distributing power to multiple motors. Its arrangement can simplify equipment coordination and maintenance planning, but the term alone does not establish voltage, fault capability, control functionality, or suitability for a particular installation.

What an MCC contains—and how it differs from switchgear

An MCC typically consists of a structural enclosure divided into sections, a shared power bus, and individual compartments or units for motor circuits. Depending on the design, a unit may contain a combination starter, motor-protective device, contactor, overload protection, and control components. Feeder units and auxiliary compartments may also be included when needed. The exact configuration depends on the motors, operating method, protection scheme, and project requirements; not every MCC contains the same devices.

The common bus supplies multiple outgoing units, while each motor circuit provides its own means of control and protection. MCCs are often discussed alongside switchboards and switchgear because all distribute electrical power, but those terms are not interchangeable. A switchboard may serve broader distribution loads, while an MCC is organized around motor circuits. In project documents, identify the intended assembly and its function rather than relying on a broad label such as “switchgear.”

Illustrative application: coordinating several motor loads

Consider a hypothetical facility with pumps, fans, and conveyors supplied from one electrical distribution point. An MCC could group their motor-control units in a common lineup, with each unit sized and configured for its own motor and operating duty. Operators may benefit from having related controls together, and designers can define a common incoming supply and outgoing motor circuits. This example is illustrative only; it does not describe a completed customer installation or establish a standard configuration.

The design decision is not simply how many motor units fit in a lineup. Engineers need to consider each motor’s horsepower or full-load current, starting method, duty cycle, control location, required interlocks, and the consequence of a trip or outage. A large motor may impose different starting and bus-loading considerations from several smaller motors. Available space, heat dissipation, access, cable entry, and the planned arrangement of adjacent equipment can also affect the lineup.

Illustrative close-up of copper busbars in a motor control panel
Illustrative industry photograph · ToT89 / Wikimedia Commons · resized · CC BY-SA 4.0

Ratings, protection, and system coordination

An MCC specification should distinguish the system’s nominal voltage from the maximum voltage rating of the equipment. It should also state the required continuous-current capability and short-circuit rating, along with the available fault current at the connection point when known. Protective-device selection and coordination depend on the upstream source, feeder protection, motor characteristics, and applicable design criteria. A rating stated without its context may not be enough to determine whether an assembly is suitable.

Short-circuit performance is a system-level concern, not merely a bus value to select in isolation. The specified assembly, protective devices, and installation must be evaluated together against the project’s fault-current study and applicable requirements. If a project has an existing system, provide available one-line diagrams and relevant study information for review. Final ratings, device compatibility, component availability, standards, and any U.S.-origin requirements must be confirmed for the specific order.

Common misunderstanding: an MCC is not just a row of starters

A frequent misunderstanding is that an MCC is a collection of motor starters that can be combined without regard to the shared bus or enclosure. In practice, the bus, structure, unit arrangement, internal wiring, and protective-device coordination form an integrated assembly. Changes to one unit can affect space, heat, wiring routes, operating clearances, or the overall electrical design. A description such as “six starters” is therefore a useful starting point, not a complete specification.

Another point to clarify is whether a requirement for UL 891 applies. UL 891 pertains to low-voltage switchboards; it is not a general listing for MCCs or medium-voltage equipment. Do not treat it as a substitute for identifying the applicable product standard or required documentation for the assembly being specified. Ask the manufacturer to confirm the standards and documentation applicable to the proposed configuration rather than assuming a particular listing or certification.

Controls and interfaces shape the lineup

Control requirements can change the design as much as power ratings do. Specify whether each motor is started across the line or uses another starting method, and describe required local or remote operation, permissives, interlocks, alarm contacts, and status signals. If a programmable controller or building system will exchange signals with the MCC, define the expected interface and responsibility for field wiring. Control-voltage needs and separation of power and control wiring should be addressed in the project documents.

Mechanical and installation interfaces deserve equal attention. The purchaser should identify indoor or outdoor conditions, enclosure requirements, cable-entry direction, conduit or cable approach, access constraints, lineup dimensions, and any connection to upstream or downstream equipment. For a Dallas–Fort Worth project or a shipment elsewhere in the country, site conditions and delivery constraints still need to be specified rather than inferred from the destination. Confirm shipping configuration and handling requirements with the supplier before finalizing the installation plan.

Documentation and information to provide for a quote

A useful quote package gives the manufacturer enough information to distinguish required functions from preferences. Include the one-line diagram, system nominal voltage, available fault-current information, motor schedule, required short-circuit rating, incoming and outgoing connection details, control narrative, and applicable project specifications. Also provide the desired number and type of units, enclosure and environmental requirements, physical constraints, and any documentation or origin requirements. Identify open items explicitly so they can be resolved during engineering review.

A manufacturer building new equipment can use those details to develop a project-specific proposal and confirm component availability, ratings, standards, and configuration before an order is finalized. Custom builds and shorter lead time may be goals, not guarantees; schedule depends on the approved design and component supply. Review drawings and submittals for the exact bus arrangement, unit contents, interfaces, and documented ratings. Related terms worth defining in the same project are motor starter, feeder, common bus, short-circuit rating, and control interlock.

PROJECT CONSIDERATIONS

Specifications & planning

Review the details that matter for your application. Final specifications and availability should be confirmed for your project.

Motor Control Center: specifications and planning considerations
Evaluation factorInformation to establish
System supplyNominal voltage, source arrangement, and connection details
Motor circuitsMotor data, starting method, control needs, and protection
Fault capabilityAvailable fault-current study and required assembly rating
Installation interfacesEnvironment, cable entry, access, dimensions, and delivery constraints
READY TO DISCUSS YOUR PROJECT?Let's build what's next.
Call (951) 403-5738
LET'S GET TO WORK

Power your next project
with confidence.

Talk through your switchgear and power distribution needs with our team.

Call (951) 403-5738
Request a Quote