A source section and its feeder sections are more than adjacent cubicles: together they define how medium-voltage power enters, is measured, interrupted, isolated, and distributed. A useful design starts with the one-line and operating intent, then tests whether the proposed compartments and interfaces fit the actual system and project requirements.
Translate the one-line into a physical lineup
On a conceptual one-line, identify each incoming source, bus, tie or alternate source, and outgoing feeder before choosing a lineup arrangement. The source section may contain the incoming switching or interrupting device and associated protection; feeder sections provide individual outgoing circuits. Their exact contents depend on the specified equipment design and application. A one-line should show which devices connect to which bus and whether a tie is normally open, normally closed, or not included.
Section order and access matter as much as the electrical symbols. Indicate cable approach, room entry, front or rear access expectations, and any constraints on lineup length or height. A compact arrangement can reduce floor-space demands, while more separation or working access may improve maintainability. These are layout decisions for the project team to review against the manufacturer’s available construction and the installation environment.
Define source and feeder compartment functions
For the incoming section, specify the source characteristics and the intended switching and protection functions rather than relying on a generic label such as “main.” Clarify whether the source is utility, transformer, generator, or another supply; its nominal system voltage; available fault information; grounding method; and the required device and relay functions. Equipment maximum voltage and interrupting or withstand ratings are separate selection checks and must be confirmed for the specific order.
For every feeder, identify the served load or downstream equipment, expected load current, cable details, protection intent, and any operating constraints. Feeder compartments may need different control, instrument, or termination provisions from one another. A schedule that distinguishes each circuit reduces the risk of treating unlike loads as interchangeable. Actual compartment configuration, component availability, and ratings require manufacturer and engineering review.

Place metering where it answers the right question
Metering location follows the measurement objective. Incoming metering can represent total supply to a bus, while feeder metering can help distinguish individual outgoing loads. If the project requires utility revenue metering, confirm the utility’s accepted arrangement and requirements early; a general equipment description does not establish that an assembly or metering scheme meets a particular utility’s rules.
Show instrument-transformer needs, meter location, wiring and communications interfaces, and whether measurement is intended for monitoring, protection, billing, or more than one purpose. Consider how technicians will access and maintain metering components within the selected compartment arrangement. The project engineer, utility, and equipment supplier should resolve these interfaces before drawings are approved, including who furnishes meters, relays, wiring, and communications components.
Make isolation intent explicit
A one-line should distinguish interruption from isolation. A circuit breaker or other interrupting device performs its specified switching duty; it should not be assumed to provide every isolation function the project requires. State which source and feeder circuits must be isolated, what visible or otherwise specified isolation means for the application, and how the intended operating sequence relates to the equipment design. Final operating and safety procedures belong to qualified project personnel and must follow approved documentation.
Isolation choices affect compartment interfaces, interlocking, access, and the lineup’s operating concept. Where multiple sources or a bus tie are involved, review possible backfeed paths and define the intended normal and alternate configurations. Do not infer that a particular interlock, grounding provision, or isolation feature is included from a conceptual diagram; identify it in the specification and confirm its design and availability.
Coordinate system data, boundaries, and approvals
A quote request should include the current one-line, equipment schedule, system nominal voltage, frequency, source and grounding information, available short-circuit data, required continuous and short-circuit ratings, protection and metering intent, cable entry and termination details, and site dimensional constraints. Include applicable project specifications and standards, environmental conditions, control power, communications, and any required interfaces with transformers, relays, utility equipment, or downstream gear. Incomplete fault or interface data can prevent meaningful configuration review.
A representative scenario is a facility with one incoming medium-voltage source feeding a main bus and several separately protected outgoing circuits, with incoming metering and a defined isolation approach. This is an illustrative concept, not a customer installation or a claim of a standard available lineup. Before approval, the engineer of record and other responsible parties should verify coordination, protection settings, short-circuit duty, utility acceptance, code and standards requirements, and installation clearances. Scope boundaries for supply, field connections, testing, and installation must be stated rather than assumed.
Confirm the build against the project
Medium-voltage equipment is commonly described by nominal system voltage, while the equipment’s maximum voltage rating is a distinct value that must suit the application. Classes such as 5 kV, 15 kV, 27 kV, and 35 kV are medium-voltage contexts, not UL 891 low-voltage switchboard ratings. Required short-circuit ratings, construction, standards, and any U.S.-origin requirements also need project-specific confirmation; no general description substitutes for approved submittals.
The manufacturer builds and supplies new equipment, with custom configurations, American components, and shorter lead time as a goal rather than a guarantee. Availability and suitability of a particular source-and-feeder arrangement must be verified before it is offered. Customers in Dallas–Fort Worth and elsewhere can provide project documents for review, but service to a region does not imply a local factory, installation service, or a guaranteed delivery date.
Specifications & planning
Review the details that matter for your application. Final specifications and availability should be confirmed for your project.
| Evaluation factor | Information to confirm |
|---|---|
| Source arrangement | Supply type, nominal voltage, grounding, and normal operating configuration |
| Feeder definition | Circuit count, load purpose, protection intent, cable entry, and terminations |
| Metering and isolation | Measurement objective, utility requirements, isolation intent, and interfaces |
| Project validation | Fault data, ratings, standards, clearances, availability, and approval responsibility |