13.8 kV Distribution Bus and Feeder Planning

Plan 13.8 kV distribution bus and feeder arrangements by comparing continuity goals, fault duties, protection interfaces, and engineering inputs.

MADE IN USAAmerican components
UL 891Switchboard assemblies
SHORT LEAD TIMESConfirm your project schedule
BUILT FOR YOUR PROJECT

Power distribution, with purpose.

Planning a 13.8 kV distribution system starts with the work the bus and feeders must perform during normal operation and credible outages. The nominal system voltage is not, by itself, a complete equipment rating; specify the applicable maximum voltage, insulation requirements, current duties, fault withstand, and protection interfaces for engineering review.

Choose a bus arrangement around continuity goals

A single bus is often the most direct arrangement: incoming sources and outgoing feeders connect to one bus, with relatively straightforward operation and protection. Its central tradeoff is that a bus fault or certain maintenance conditions can affect multiple circuits. A sectionalized bus divides the system with a bus-tie breaker, allowing portions to be isolated or supplied separately when the operating plan and source capacity permit. The tie improves flexibility, but adds equipment, interlocking, protection coordination, and operating decisions that must be designed rather than assumed.

For higher continuity objectives, a double-bus or transfer arrangement may provide additional switching options, but it also increases circuit interfaces and can complicate protection and maintenance procedures. Define which loads must remain supplied, how much interruption is acceptable, whether alternate feeds are available, and what switching states are permitted. A continuity objective is not a guarantee: available source capacity, fault location, relay operation, and safe switching boundaries determine what the arrangement can actually support.

Define feeder duty before selecting components

For each outgoing feeder, identify the connected load, expected operating current, starting or inrush behavior, future load allowance, and the downstream equipment being supplied. Motors, transformers, capacitor banks, and long cable runs can impose different switching and protection needs even when their steady-state current appears similar. Document cable type, conductor size, route length, grounding method, and termination requirements so the switchgear interfaces are coordinated with the field design.

The short-circuit study should establish available fault current at the switchgear and downstream locations, including contributions from utility sources, generators, and motors where applicable. Specify the required interrupting and momentary duties, bus and circuit withstand, and the duration associated with the applicable ratings. Do not infer these values from 13.8 kV nominal voltage or select them from an illustrative example. The responsible engineer must verify the study assumptions, equipment maximum rating, system grounding, and applicable standards for the specific order.

Illustrative close-up of copper busbars in a motor control panel
Illustrative industry photograph · ToT89 / Wikimedia Commons · resized · CC BY-SA 4.0

Coordinate relays, breakers, and control interfaces

Protection requirements begin with the one-line diagram and the intended trip boundaries. Identify source, bus, tie, and feeder protection functions; required instrument transformer ratios and accuracy; and whether metering, event records, communications, or arc-flash mitigation functions are needed. Relay settings depend on the system study, downstream devices, grounding, and operating configurations. A relay function list is not a substitute for approved coordination curves and settings.

Specify control power, trip and close circuits, local and remote control authority, status points, alarms, and any required interface to a plant control system or supervisory network. Clarify communication protocols, network ownership, cybersecurity constraints, and who supplies wiring beyond the switchgear terminals. Interlocks should reflect the approved operating sequence and prevent prohibited switching states. Final logic, ratings, settings, and interfaces require review by the responsible electrical engineer and confirmation against the selected components.

Resolve the boundaries between switchgear and site systems

A useful specification defines what is inside the equipment scope and what is furnished by others. State the incoming and outgoing cable entry direction, termination type, phase arrangement, grounding connections, bus connections, and any provisions for future circuits. Confirm room dimensions, access and removal paths, floor loading, ventilation, environmental conditions, seismic criteria where applicable, and working clearances with the project team. These constraints can affect lineup configuration and should be known before a quote is finalized.

Also identify how the assembly connects to upstream transformers or utility equipment and to downstream cables, motor-control equipment, or transformers. Confirm neutral and grounding treatment, surge protection needs, metering ownership, and whether external relays or control devices are part of the design. Shipping plans should account for delivery access, unloading method, route restrictions, and any limitations on shipment sections. Dallas–Fort Worth projects and nationwide shipments both benefit from resolving these interfaces early; serving a region does not imply a local manufacturing facility.

Prepare a complete basis for quote and engineering review

For a useful quote request, provide the one-line diagram, load schedule, operating and continuity objectives, fault-current study or available source data, grounding details, preliminary relay philosophy, and required equipment ratings. Include the number and purpose of feeders, anticipated future positions, cable and termination information, control and communication requirements, environmental conditions, and relevant site and delivery constraints. Mark assumptions and identify decisions that remain open so they can be reviewed rather than silently treated as requirements.

A manufacturer can develop a new custom assembly using American components and can make shorter lead time a goal, subject to design scope, component availability, and project requirements. For low-voltage portions, UL 891 may apply to qualifying switchboards; it is not a general listing for 13.8 kV switchgear. Confirm applicable standards, construction details, US-origin requirements, and any requested certifications for the specific order. Final equipment ratings and relay settings must be confirmed through project-specific engineering review, not selected from a planning example.

PROJECT CONSIDERATIONS

Specifications & planning

Review the details that matter for your application. Final specifications and availability should be confirmed for your project.

13.8 kV application: specifications and planning considerations
Evaluation factorInformation to establish
Bus arrangementContinuity objective, sectionalizing plan, and permitted operating states
Feeder dutyLoad profile, starting behavior, cable interface, and future allowance
Fault performanceStudy-based available current, withstand duty, and clearing assumptions
Protection interfaceTrip boundaries, instrument transformer needs, control power, and communications
READY TO DISCUSS YOUR PROJECT?Let's build what's next.
Call (951) 403-5738
LET'S GET TO WORK

Power your next project
with confidence.

Talk through your switchgear and power distribution needs with our team.

Call (951) 403-5738
Request a Quote