Demand measurement turns changing electrical load into a value that can inform service planning, equipment sizing, operating decisions, and utility coordination. A useful load profile depends on more than the meter: the interval definition, measurement points, instrument-transformer ratios, accuracy needs, and handling of recorded data all affect what the numbers mean. For a new distribution assembly, these choices should be settled against the one-line diagram and the intended use of the readings, then confirmed by qualified electrical professionals.
Define the question before choosing the meter
Demand is typically an average over a defined interval, rather than an instantaneous peak. A 15-minute demand value, for example, represents the measured energy or power averaged over that interval under the meter’s configured method. A load profile is the series of such readings over time. Interval length, timestamp convention, units, and whether the displayed value is real, apparent, or reactive power matter when comparing data with a utility bill or using it to assess a feeder.
Start by specifying what decision the measurements must support. A facility evaluating peak demand may need interval kW at the service entrance, while an operator investigating a heavily loaded branch may need readings at selected downstream feeders. Measuring only the main bus cannot identify which branch caused a peak. Conversely, many measurement points add instrument transformers, wiring, configuration, commissioning, and data-management needs. The design should connect each point to a stated operational or planning question.
Gather source data and map measurement points
Useful design inputs include the current one-line diagram, nominal system voltage, grounding arrangement, phase configuration, expected load range, service and feeder ratings, and the location of the intended measurement point. Include the utility’s metering requirements if utility settlement or billing is involved; customer monitoring is not automatically a substitute for utility-owned or utility-approved metering. Identify whether readings are needed for a main, tie, generator, transformer secondary, or individual feeder, and note any operating modes that change which source supplies the load.
A practical source-data check compares drawings with equipment schedules, available fault-current information, existing meter records, and the intended communications system. A discrepancy in voltage or transformer connection can affect both measurement wiring and interpretation. Specify whether the meter must retain interval data locally, export files, communicate to a building-management or energy platform, or provide only a local display. Data ownership should be explicit: determine who can access, configure, export, retain, and interpret records, and who is responsible for time synchronization and backups.

Select CTs and VTs for the application
Current transformers must suit the conductor arrangement, expected current range, installation space, and meter input. Their ratio influences how well the meter resolves ordinary operating load as well as high demand, so choosing a ratio solely from a breaker frame or bus rating can produce unhelpful resolution at typical load. Specify the required accuracy class and burden as appropriate to the application, and coordinate secondary wiring, polarity, shorting provisions, and terminal access with the equipment design. CT selection and connection details require engineering review; incorrect application can impair readings and create hazards.
Voltage transformers, when required, must match the system’s nominal voltage, grounding and connection scheme, insulation requirements, and the meter’s voltage inputs. Some applications may use direct voltage inputs within the meter’s ratings, while others need VTs; this is a design decision, not a universal rule. Keep system nominal voltage distinct from an instrument transformer’s rating and the assembly’s equipment maximum rating. Confirm ratios, fusing or protective arrangements, wiring burden, and any utility-specific requirements for the exact order.
Treat accuracy and data quality as design requirements
Meter accuracy is only one part of measurement uncertainty. CT and VT accuracy, their operating range and burden, wiring, phase identification, meter configuration, and installation all contribute to the result. A high-accuracy meter cannot correct an unsuitable CT ratio, swapped phases, incorrect polarity, or a configured ratio that does not match the installed transformers. Define whether the application is operational trending, internal energy allocation, or a requirement governed by a utility or other authority; the required accuracy and verification process may differ.
Interval data also needs context. Document the interval duration, demand calculation method, time zone, daylight-saving treatment, units, and whether the meter records instantaneous values, interval averages, or both. A brief event between interval boundaries can be obscured by averaging, while a rolling-demand method may not align with fixed billing intervals. Preserve meter setup and commissioning records with exported data so future users can distinguish a real load change from a changed ratio, clock, firmware setting, or measurement point.
Compare options with a hypothetical decision
Consider a hypothetical facility reviewing whether a service transformer is experiencing recurring high demand. If its only goal is to compare monthly peak kW with utility statements, a correctly specified service-level meter with interval logging may answer the question. If managers also need to identify which process drives that peak, the design may require additional feeder measurements or a temporary, professionally planned measurement study. The second approach can improve attribution but adds sensors, wiring, channels, commissioning effort, and data review.
The choice also depends on whether the distribution assembly is being built new or integrated with an existing monitoring platform. A local meter with downloadable records may be simpler where network access is restricted; networked monitoring can support centralized analysis but raises interface, cybersecurity, software compatibility, and data-retention questions. Neither option is inherently superior. For a new custom assembly, provide the desired measurement points and interface requirements early so component selection and panel layout can be coordinated, without assuming a specific capability until it is confirmed for the proposed equipment.
Prepare records and define what the result can prove
For a quote, provide the one-line diagram, voltage and grounding details, service and feeder information, desired measurement points, available CT or VT data, and the intended demand interval and use. Include meter preferences or existing system interfaces, communications protocol requirements, environmental and enclosure constraints, utility specifications where applicable, and any required submittal format. After design, retain approved drawings, instrument-transformer ratios and connection diagrams, meter configuration, accuracy documentation, commissioning results, and data-export instructions. These records make later profile analysis substantially more reliable.
A load profile describes measured conditions at its monitored points and during its recorded period; it does not by itself establish future peak load, equipment capacity, code compliance, or the cause of an event. Seasonal changes, occupancy, process schedules, outages, and unmonitored branches can limit conclusions. A qualified engineer or other responsible professional should review the measurement plan, final settings, work practices, and applicable code interpretation. For projects in Dallas–Fort Worth or elsewhere, confirm project-specific ratings, short-circuit requirements, component availability, standards, and any U.S.-origin requirements before order. Custom new equipment and UL 891 low-voltage switchboards may be considered where applicable; UL 891 does not apply as a general listing for medium-voltage gear.
Specifications & planning
Review the details that matter for your application. Final specifications and availability should be confirmed for your project.
| Evaluation factor | What to define |
|---|---|
| Measurement point | Service, bus, tie, or selected feeder |
| Demand method | Interval duration, calculation, units, and timestamp basis |
| Instrument transformers | CT/VT ratios, connection, accuracy needs, and burden; engineering review required |
| Data handling | Local retention, export or network interface, access, ownership, and time synchronization |