Power distribution, with purpose.
Medium-voltage switchgear connects utility or on-site power sources to transformers, feeders, and large loads, so a sound specification must address more than nominal voltage. The right design depends on the system’s highest operating voltage, fault duty, switching arrangement, protection scheme, and the space and access available at the installation. We manufacture new custom switchgear and supply customers in Dallas–Fort Worth and nationwide. A quote is more useful when it starts with the one-line diagram, project requirements, and site constraints—not a voltage label alone.
Select the voltage class from system data
Start with the system nominal voltage, grounding method, frequency, and the equipment’s required maximum voltage rating. These are related but not interchangeable values: the nominal system voltage describes the network, while the equipment rating must suit its operating conditions and applicable design requirements. Common medium-voltage classes include 5 kV, 15 kV, 27 kV, and 35 kV, but the class name by itself does not establish suitability for a particular system.
The specification should also identify continuous current, short-circuit duty, momentary and interrupting requirements where applicable, and the expected source and load conditions. Utility fault-current information may affect bus bracing, breaker selection, and protection coordination. Ratings, component availability, standards requirements, and any U.S.-origin requirements must be confirmed for the specific order. UL 891 applies to low-voltage switchboards, not medium-voltage switchgear.
Choose metal-clad or enclosed construction deliberately
Metal-clad switchgear generally uses grounded metal barriers to segregate major compartments, with drawout circuit breakers commonly used to support isolation and maintenance practices. The arrangement can be valuable where operators need defined separation between bus, breaker, and cable compartments, or where the operating plan calls for removable breakers. The actual compartment design, shutters, interlocks, and access provisions must be stated and reviewed rather than inferred from the term “metal-clad.”
Enclosed switchgear is a broader description for equipment within an enclosure and does not, by itself, promise a particular internal segregation or breaker arrangement. A more compact or fixed design may suit some installations, while other applications need the access, isolation, or maintenance features associated with a specified metal-clad lineup. Compare footprint, cable access, service clearances, environmental exposure, and operating procedures against the project’s risk and maintenance priorities before choosing a construction type.

Coordinate relays with the protection scheme
Protection relays should be selected around the system’s fault-clearing and operating objectives, not as an accessory chosen after the switchgear layout is fixed. Identify the required protection functions for incoming sources, bus ties, transformers, and outgoing feeders, along with metering, event records, communications, and any supervisory-control interface. Current and voltage transformer ratios, accuracy needs, burdens, polarity, and locations affect both relay application and wiring.
Provide available coordination studies or relay settings criteria when requesting a quote, and identify who will supply final settings and approve the protection design. Breaker trip circuits, control power, close and trip commands, interlocks, alarms, and communications should be defined at the equipment interface. Where the new lineup connects to existing gear or a utility system, confirm signal conventions, terminal points, phase identification, and responsibility for drawings early to reduce commissioning changes.
Resolve the physical installation before release
Medium-voltage lineups can be difficult to move after delivery because of their size, weight, and shipping configuration. Confirm the route from the receiving point to the electrical room, including door openings, turns, floor loading, overhead obstructions, and any lifting or rigging limits. Room dimensions alone are not enough: working space, egress, ventilation, cable trenches, and access for inspection or breaker handling can determine whether a proposed arrangement is practical.
Cable entry and termination details deserve particular attention. Specify top or bottom entry, cable type and quantity, conductor size and material, termination approach, phase spacing needs, and any transition to transformers, bus duct, or existing equipment. Also establish grounding provisions, conduit or trench interfaces, and environmental conditions such as altitude, temperature, humidity, dust, or corrosive exposure. These details are subject to engineering review and can affect enclosure design, component selection, and the feasible lineup arrangement.
Prepare a quote package that supports engineering
For a useful quotation, provide the latest one-line diagram, nominal system voltage and grounding, available fault-current data, requested equipment ratings, and the number and purpose of each breaker or switch position. Include protection and metering requirements, control-power source, preferred communications, applicable project standards, and any required documentation or testing. If the project has a prescribed construction type or preferred component basis, state it as a requirement or preference rather than assuming it is included.
Add room plans, elevation and access information, cable-entry requirements, environmental conditions, delivery destination, and target schedule. Identify interfaces with transformers, generators, utility connections, or existing switchgear, and flag any U.S.-origin, procurement, or standards clauses that must be verified. We build new custom equipment using American components, with shorter lead time as a goal rather than a guarantee. Final ratings, design details, component availability, and schedule depend on review of the specific order.
Specifications & planning
Review the details that matter for your application. Final specifications and availability should be confirmed for your project.
| Evaluation factor | Information to establish |
|---|---|
| System voltage | Nominal voltage, grounding, and required equipment maximum rating |
| Fault duty | Available fault current and required short-circuit performance, subject to engineering review |
| Construction | Metal-clad or enclosed preference, breaker arrangement, and access requirements |
| Protection and site | Relay functions, interfaces, cable entry, room clearances, and delivery constraints |