Power distribution, with purpose.
A 34.5 kV system is typically a medium-voltage distribution application, but that label alone does not define the equipment or its service boundary. A sound specification maps who owns each connection, where protection and metering apply, and which party supplies the settings and approvals. The details must be confirmed with the serving utility and the project’s responsible engineer before equipment is selected.
Establish the service boundary before selecting equipment
Start with the utility’s service requirements and a one-line diagram that identifies the point of delivery, ownership boundary, normal operating configuration, and downstream loads. The point of delivery is not automatically the same as the metering point or the location of the first customer-owned protective device. Spell out these locations and responsibilities so the utility, owner, engineer, and equipment supplier are working from the same arrangement.
For a Dallas–Fort Worth project or a facility elsewhere, obtain the serving utility’s current requirements rather than relying on a neighboring project’s drawings. Confirm who furnishes incoming conductors, terminations, metering devices, instrument transformers, and any service-side switching equipment. Utility practices vary, and a boundary left ambiguous can result in incompatible interfaces, delayed review, or a gap in responsibility for protection.
Define what 34.5 kV means for the design
Provide the system nominal voltage and the required equipment maximum voltage as separate specification values. A 34.5 kV nominal system is generally treated as medium voltage; the equipment’s insulation and withstand requirements must suit the actual system and utility conditions. Do not assume that a voltage label establishes the correct rating or that low-voltage switchboard standards apply. UL 891 pertains to low-voltage switchboards, not 34.5 kV equipment.
The engineer should establish grounding method, available fault current, frequency, insulation coordination, and exposure to switching surges or other site conditions. Short-circuit withstand and interrupting duties must be checked against the specific protective device and system study. These are design inputs, not values to infer from the nominal voltage. Confirm each rating and applicable standard for the actual order and equipment configuration.

Coordinate protection, metering, and control interfaces
The protection concept should show which device clears each fault and how it coordinates with upstream utility protection and downstream equipment. Specify relay functions, current- and voltage-transformer requirements, trip and close circuits, control power, communications, and any required interlocks. The utility may impose requirements for service protection or review settings; identify that review early and provide the engineer’s approved study and settings documentation when available.
Metering needs its own defined boundary. Confirm whether revenue metering is utility-furnished, customer-furnished, or divided between parties, and document transformer ratios, accuracy requirements, burden, polarity, secondary wiring, test provisions, and enclosure access as applicable. Protection and metering may use separate instrument-transformer cores or arrangements. The utility and responsible engineer must review the proposed interface; a generic diagram cannot determine final connections or settings.
Resolve physical arrangement and project tradeoffs
The site layout affects the lineup configuration and the practical service interface. Provide available indoor or outdoor space, access and egress constraints, cable entry direction, conductor type and termination details, environmental conditions, and any seismic or enclosure requirements. Include the utility’s preferred arrangement and the location of any customer transformer or major load. Changes to cable routing or termination space can affect equipment dimensions and coordination even when the electrical one-line remains unchanged.
Discuss maintainability and operating philosophy alongside initial cost and schedule. For example, a project may prioritize a visible isolation point, reduced outage scope, or a particular metering location, but each choice can change the lineup, interlocking, or utility approval process. Treat these as project decisions for engineering review, not as features that can be presumed available in every configuration. Equipment capability and component availability must be verified against the final specification.
Provide quote inputs and verify capability
A useful request for quotation includes the one-line diagram, utility service requirements, load and fault-study data, nominal voltage and equipment maximum rating, required continuous-current and short-circuit duties, grounding method, protection philosophy, metering scope, and control schematics. Add site and cable information, environmental conditions, requested documentation, applicable standards, delivery destination, and required schedule. Mark unresolved values clearly so assumptions can be reviewed rather than mistaken for approved requirements.
A U.S. manufacturer can evaluate a new custom equipment build and identify which American components, configuration, and documentation may suit the application. Shorter lead time can be a goal, not a guarantee; project-specific engineering, component availability, utility review, and US-origin requirements can affect feasibility and schedule. Ask for capability confirmation against the actual documents before relying on any proposed rating, standard, or origin representation.
Keep design authority and records clear
The equipment supplier’s proposal should be reconciled with the approved one-line, interface schedule, protection and metering drawings, and utility comments. Record assumptions, exclusions, required customer or utility-furnished items, and any open technical questions. The responsible engineer should resolve discrepancies and approve final ratings, protective-device selections, relay settings, and coordination before the design is released for procurement or construction.
For a hypothetical example, a utility could own the incoming service conductors and revenue meter while the customer owns the first protective device and downstream distribution. That boundary would still need confirmation from the utility and project engineer; it is not a standard arrangement for every 34.5 kV service. Clear, reviewed records help prevent scope gaps without treating an example as a design or a promise of equipment capability.
Specifications & planning
Review the details that matter for your application. Final specifications and availability should be confirmed for your project.
| Evaluation factor | Information to confirm |
|---|---|
| Service boundary | Point of delivery, ownership, and party responsible for each interface |
| Voltage basis | System nominal voltage and separately specified equipment maximum rating |
| Protection duty | Study-based fault values, device duties, coordination, and approved settings |
| Metering scope | Utility requirements, transformer details, accuracy, wiring, and responsibility |
