347/600 V Switchgear and Switchboards

Specify 347/600 V switchgear with grounding, phase arrangement, nameplate ratings, and standards in view. Learn what to confirm before requesting a quote.

MADE IN USAAmerican components
UL 891Switchboard assemblies
SHORT LEAD TIMESConfirm your project schedule
BUILT FOR YOUR PROJECT

Power distribution, with purpose.

A 347/600 V designation describes a three-phase system with 347 V from phase to neutral and 600 V phase to phase. It does not, by itself, establish the voltage rating of every switchgear or switchboard component. Before selecting equipment, align the system grounding and phase arrangement with the actual supply, then verify the assembly and component nameplates against the application. These details matter for new equipment serving commercial, institutional, and industrial loads, including projects in the Dallas–Fort Worth region and elsewhere in the United States.

Read 347/600 V as a system relationship

In a conventional 347/600 V wye system, 600 V is the nominal phase-to-phase voltage and approximately 347 V is the phase-to-neutral voltage. Loads connected phase to phase use the higher system voltage; compatible line-to-neutral loads use the lower voltage. The slash notation therefore describes two related voltages, not a range from which a designer can select either value without regard to the connection. Confirm the source configuration and the intended load connections rather than relying on a voltage label alone.

The system’s nominal voltage must also be distinguished from equipment maximum voltage or insulation ratings. A switchboard nameplate and the markings on breakers, bus, metering devices, surge protective devices, and other components may express ratings differently. Suitability depends on the specific system and the applicable equipment documentation. Do not assume that a device marked for 600 V is appropriate in every 347/600 V application, or that a component rated for a particular phase-to-phase voltage is suitable for phase-to-neutral service.

Specify grounding and neutral treatment explicitly

Identify whether the source is solidly grounded, impedance grounded, or configured in another way, and state how the neutral is brought to the equipment. A 347/600 V wye supply commonly has a neutral available, but the notation alone does not prove the grounding method or whether a neutral conductor is required at every section. The grounding arrangement affects ground-fault protection, sensing, overcurrent coordination, and the way the switchgear interfaces with the upstream source.

Clarify whether the assembly is intended as service equipment or as downstream distribution equipment, because bonding and neutral isolation requirements differ by application. Provide the available ground-fault protection scheme and any project requirements for a neutral bus, equipment grounding bus, or ground bus connections. Final bonding and protection details should be coordinated with the electrical design, utility requirements where applicable, and governing codes. An unclear neutral or grounding description can lead to mismatched protection and avoidable redesign.

Illustrative close-up of copper busbars in a motor control panel
Illustrative industry photograph · ToT89 / Wikimedia Commons · resized · CC BY-SA 4.0

Confirm phase, wire, and load arrangement

State the number of phases and wires, including whether the incoming service is three-phase, four-wire wye with neutral, and whether any loads are three-wire or single-phase. Identify which loads operate at 347 V phase to neutral and which use 600 V phase to phase. This allows the design team to assess feeder and branch-device requirements, neutral loading, metering, and the distribution of single-phase loads across phases. If the installation includes a different source arrangement, describe it directly rather than assuming the slash voltage conveys all connection details.

Consider the full path from source to load: incoming conductors, main device, bus, feeder devices, neutral connections, and any downstream transformers or transfer equipment. The interface may involve existing equipment with different voltage or grounding characteristics. Provide one-line diagrams and load information where available, along with details of the upstream protective device and downstream equipment. These inputs help identify coordination issues before a new custom assembly is finalized, without presuming that every requested device or configuration is available.

Check nameplates, interrupting duty, and standards

A voltage match alone is not enough. Specify the required continuous-current ratings, short-circuit withstand or interrupting requirements as applicable, and the available fault current at the equipment location. The selected ratings must coordinate with the source and protective devices, and must be suitable for the particular assembly and components. Provide the calculation basis or study information when available, and identify any project-specific requirements for arc-flash labeling or protection coordination without treating those items as substitutes for proper equipment ratings.

For low-voltage switchboards, UL 891 may be applicable, subject to the design and order requirements; it is not a general standard for medium- or high-voltage switchgear. Identify the governing codes, specifications, and any required certifications or markings in the quote request, then confirm their applicability for the proposed assembly. Ratings, component availability, standards, and U.S.-origin requirements must be reviewed for the specific order. A system nominal voltage of 600 V should not be confused with a claim that a particular assembly has a specific listing or approval.

Prepare a complete request for a new assembly

For a useful quote, supply the nominal system voltage and source configuration, grounding method, phase and wire count, and whether a neutral is required. Include the one-line diagram, main and feeder device requirements, bus and enclosure details, available fault current, load schedule, and applicable project specifications. Note the installation environment, service conditions, incoming and outgoing cable arrangements, and any interfaces with existing switchgear or controls. State the requested delivery destination and timing so the manufacturer can evaluate logistics and lead time as part of the order review.

The manufacturer builds and supplies new equipment, including custom assemblies, and uses American components where specified and available. Shorter lead time is a goal, not a guaranteed delivery commitment; timing depends on the approved design, component availability, and order requirements. Buyers in Dallas–Fort Worth and across the country should provide the same technical detail for an accurate engineering review. Confirm the final nameplate values, short-circuit ratings, applicable standards, and any U.S.-origin requirements before release, rather than inferring them from a general 347/600 V description.

PROJECT CONSIDERATIONS

Specifications & planning

Review the details that matter for your application. Final specifications and availability should be confirmed for your project.

347/600 V equipment: specifications and planning considerations
Evaluation factorInformation to confirm
System voltageNominal 347 V phase-to-neutral and 600 V phase-to-phase relationship; verify source configuration
Grounding and neutralGrounding method, neutral availability, bonding point, and protection scheme
Phase and loadsPhase and wire count; identify 347 V and 600 V load connections
Equipment dutyNameplate voltage, continuous rating, fault-duty requirements, and applicable standards; subject to engineering review
READY TO DISCUSS YOUR PROJECT?Let's build what's next.
Call (951) 403-5738
LET'S GET TO WORK

Power your next project
with confidence.

Talk through your switchgear and power distribution needs with our team.

Call (951) 403-5738
Request a Quote