Power distribution, with purpose.
A useful custom switchgear quote begins with enough project detail to define the assembly, its electrical limits, and how it must connect to the rest of the facility. For a new build, send the latest available drawings and identify open decisions rather than assuming a standard lineup will fit. Clear inputs help the manufacturer assess the design, flag conflicts, and work toward a shorter lead time without promising a delivery date before scope and component availability are confirmed.
Define the project and the equipment boundary
Start by explaining what the new assembly must do and where its scope begins and ends. State whether the request is for a low-voltage switchboard, medium-voltage switchgear, or another assembly, and identify the equipment it connects to on both the source and load sides. Note whether the quote should include only the switchgear or also specified metering, protective devices, controls, and accessory compartments. A clear boundary prevents two parties from assuming the other is supplying a required component.
Include the project stage, target service date, delivery destination, and any known constraints on unloading or access. If the project is in Dallas–Fort Worth, identify the actual site and delivery requirements rather than assuming local manufacturing or installation. For a replacement, provide available nameplate data and dimensions for the existing interface, but distinguish verified measurements from estimates. Photos can help explain layout, but they do not replace drawings or confirmed electrical data.
Send the one-line and establish electrical ratings
The latest single-line diagram is often the most important quote document. Show the source arrangement, transformers, bus ties, feeder quantities, major loads, grounding method, and protective-device functions. Mark proposed changes clearly if the drawing is preliminary. Identify system frequency and nominal voltage, then specify the equipment rating required for the application; nominal system voltage and the equipment’s maximum voltage rating are related but are not interchangeable terms.
Provide available fault-current information at the point of connection, including the basis and date of the study when known. State the required short-circuit or interrupting ratings and any coordination constraints, but do not assume a rating can be selected from voltage alone. For medium-voltage equipment, identify the applicable voltage class, such as 5 kV, 15 kV, 27 kV, or 35 kV where relevant. Those classes are not UL 891 categories; UL 891 applies to low-voltage switchboards. Ratings and standards must be reviewed for the specific design.

Describe the lineup, devices, and operating requirements
Translate the one-line into a proposed equipment schedule where possible. For each main, tie, and feeder, identify the device type, continuous-current requirement, trip or fuse information, and any metering or communications function. State which loads are essential, whether transfer or interlocking functions are required, and whether spare spaces or future feeder provisions matter. A spare provision still needs a defined physical and electrical basis; an empty compartment is not automatically a usable future circuit.
Clarify how operators will access and control the assembly, including preferred breaker or switch arrangement, local indication, control power, and remote signals. Identify required relays, meters, communications protocols, and points to be exchanged with a building or plant control system. If a component brand or exact model is specified, explain whether it is mandatory or preferred. This distinction lets the quote address availability and substitutions transparently instead of leaving compatibility to be resolved after award.
Capture physical interfaces and site conditions
Provide available room plans and elevation drawings with lineup length limits, working-space constraints, door swings, cable trenches, and access routes. State the intended cable-entry direction and termination arrangement, conductor sizes and quantities if known, and any bus duct or transformer interface dimensions. Include conduit locations or floor openings when they affect the base or compartment layout. If dimensions remain provisional, mark them as such so a quote does not imply a confirmed fit.
Describe the installation environment with the information relevant to enclosure and construction choices: indoor or outdoor location, ambient conditions, altitude if unusual, exposure to moisture or contaminants, seismic or vibration requirements, and any site-specific enclosure expectations. State the applicable project specifications and governing code or standards requirements supplied by the engineer or owner. Do not rely on a generic location description to establish compliance; enclosure details, clearances, ratings, and construction requirements need review against the actual application.
Submit specifications and identify review decisions
Attach the project specification, equipment schedules, control schematics, and any required submittal or testing requirements. Point to the exact clauses that affect the assembly, especially where the specification conflicts with the one-line or schedule. Identify required documentation, drawing review milestones, and whether the buyer expects engineering comments before release. For low-voltage switchboards, UL 891 may be applicable; do not apply that designation to medium-voltage switchgear. Any listing, standard, or compliance claim must be confirmed for the particular proposed assembly.
Separate firm requirements from preferences and unresolved items. For example, state whether American components or a particular origin requirement is mandatory, and provide the governing definition or contract language. The manufacturer builds new equipment and can evaluate custom configurations using American components, subject to the specified design and component availability. A concise exceptions list is more useful than an unmarked specification because it shows which decisions need engineering review and which can be addressed during quotation.
Make the quote comparable and the schedule realistic
Ask the quote to identify its scope, stated assumptions, exclusions, included documentation, and the information still needed to finalize design. Request that proposed deviations and substitutions be called out explicitly. If alternate configurations are acceptable, define the performance or interface limits they must preserve. This makes competing proposals easier to compare and reduces the risk of choosing a lower initial scope that later requires added devices, revised buswork, or drawing changes.
Tie schedule discussion to the project’s actual decision points: when approved drawings are needed, when technical selections must be settled, and when delivery is required at the site. Component availability, engineering review, final ratings, and changes to the approved design can affect timing, so a shorter lead time can be a goal rather than a guarantee. Before placing an order, confirm the final ratings, short-circuit basis, interfaces, standards, component selection, and any US-origin requirements in writing for that specific assembly.
Specifications & planning
Review the details that matter for your application. Final specifications and availability should be confirmed for your project.
| Quote input | What to provide |
|---|---|
| Electrical basis | One-line, nominal system voltage, equipment rating, and fault-current study basis |
| Configuration | Main, tie, and feeder schedule with device functions and metering needs |
| Physical fit | Room plan, lineup limits, cable entry, termination, and interface dimensions |
| Project constraints | Specifications, required standards, delivery destination, and schedule milestones |