Yes. A switchgear assembly can be designed to include metering, but the right arrangement depends on what must be measured, who will use the readings, and the utility or owner’s requirements. CTs, voltage inputs, meter functions and wiring are project-specific choices—not interchangeable add-ons.
Start with the purpose of the meter
First determine whether the meter is for operational visibility, energy management, tenant allocation, or utility revenue billing. A facility may need current, voltage, demand, power factor, energy totals, alarms, or power-quality data for its own monitoring. That does not automatically make the instrument suitable for billing or acceptable to a utility. The meter’s function and required accuracy should be defined before specifying its location or signal connections.
Also identify who owns, reads, seals, and maintains the metering equipment. A customer monitoring meter may connect to a building automation or energy-management system, while utility-controlled revenue metering can have separate rules for instrument transformers, compartments, wiring, access, testing, and sealing. Confirm these requirements with the serving utility and the project engineer early; a late change can affect the switchboard layout and procurement.
CTs and voltage inputs determine what the meter can measure
Current transformers, or CTs, provide scaled current signals to a meter. Their ratio, accuracy class, burden, physical arrangement, and location must suit the circuit and the metering purpose. A CT selected for monitoring may not meet a revenue-metering specification. The design also needs to account for phase configuration, conductor or bus dimensions, available space, and how the CT secondary wiring reaches the meter. These details should be coordinated with the switchgear design rather than left to field assumptions.
Meters generally also need voltage inputs, which may be taken from appropriately protected circuit connections or voltage transformers, depending on system voltage, design, and applicable requirements. Specify the nominal system voltage, phase and wire configuration, frequency, and grounding arrangement so the measurement scheme can be evaluated. System nominal voltage is not the same as an equipment maximum rating; both the system and the specific assembly ratings must be confirmed for the order.

Utility and revenue metering need early coordination
Revenue metering is governed by the serving utility’s rules and the project’s contractual or regulatory needs. The utility may prescribe acceptable meters or instrument transformers, accuracy requirements, compartment access, test provisions, sealing, wiring methods, or a particular point of measurement. Requirements vary, so a generic statement such as “revenue-grade meter” is not a substitute for the utility’s written specification and approval process.
Clarify whether the utility supplies or specifies any metering components and whether its personnel require a dedicated compartment or a particular arrangement at the service entrance. Confirm which party is responsible for drawings, review, testing, and final acceptance. For a Dallas–Fort Worth project, the applicable utility is determined by the site and service arrangement; do not assume one utility’s requirements apply throughout the region. Resolve the governing requirements before the assembly is finalized.
Example: monitoring a main service switchboard
Consider a hypothetical commercial building whose owner wants to track main-service demand and energy use through a building management system. The design team might evaluate CTs on the incoming conductors or bus, voltage inputs suitable for the service configuration, a meter with the required measurement functions, and a communications interface compatible with the owner’s system. The team would also decide where the display belongs and whether readings must remain available if the communications network is unavailable.
If the same service meter must satisfy utility billing requirements, the design may change substantially. The utility could require a specific metering arrangement, controlled access, separate CTs, or a designated compartment. The owner’s monitoring meter might remain a separate device rather than share revenue-metering signals. This example is illustrative only; actual component selection, layout, and acceptance depend on the service, utility rules, equipment design, and engineering review.
Coordinate interfaces, documentation, and safety
Metering affects more than the meter face. Document the measurement point, CT ratios and classes, voltage-sensing method, fuse or protection requirements where applicable, terminal details, wiring diagrams, communications protocol, and required data points. Coordinate enclosure and compartment space, conductor routing, labeling, access, and any separation required by the utility or project specifications. Confirm whether the meter is owner-furnished or part of the requested assembly and who provides configuration and communications integration.
CT secondary circuits and voltage-sensing circuits are part of the electrical design and must be handled under approved procedures by qualified professionals. Do not treat metering terminals as safe to access merely because a meter is displaying information. Installation, testing, commissioning, and maintenance responsibilities should be assigned to qualified personnel, with the equipment de-energized and controlled as required by the applicable safety program and design.
What to provide for a quote and when to involve an engineer
For a useful quote, supply the one-line diagram, system nominal voltage and phase configuration, service or feeder function, available equipment space, and the metering purpose. Include the utility’s current metering requirements, requested meter functions and accuracy, CT or voltage-transformer specifications if already established, communications needs, and any project standards or US-origin requirements. Identify whether the meter and instrument transformers are owner-furnished, utility-furnished, or requested with the new assembly. Missing information should be flagged for confirmation, not replaced with assumed ratings.
Engage the electrical engineer and serving utility before design release when revenue billing, service-entrance measurement, unusual CT arrangements, multiple data systems, or a change to an existing one-line is involved. A manufacturer can evaluate a custom switchgear build and coordinate specified components, but ratings, short-circuit capability, component availability, standards, and origin requirements must be confirmed for the particular order. UL 891 applies to low-voltage switchboards where applicable; it is not a general designation for medium-voltage equipment. A shorter lead time may be a goal, not a guarantee, and depends on the approved design and component availability.
Specifications & planning
Review the details that matter for your application. Final specifications and availability should be confirmed for your project.
| Evaluation factor | Information to confirm |
|---|---|
| Meter purpose | Operational monitoring, energy management, tenant allocation, or utility billing |
| Current measurement | CT location, ratio, accuracy class, burden, and utility requirements |
| Voltage measurement | System configuration, sensing method, protection, and required inputs |
| Interfaces | Display location, communications protocol, data points, and responsible party |