Yes, switchgear can often be configured around a project’s electrical system, operating practices, and physical constraints. “Custom” does not mean every requested feature is automatically manufacturable, approved, or compatible with the other equipment. The practical first step is to define the required functions and interfaces, then have the manufacturer and the project’s qualified electrical professionals confirm what can be built and what approvals apply.
Customization starts with the electrical duty
A useful design discussion begins with the system the equipment must serve, not with a preferred enclosure or a list of accessories. Specify the nominal system voltage, frequency, phase and wire arrangement, service configuration, and whether the assembly is intended for service entrance, distribution, or another role. Also provide the available fault-current information and the required short-circuit rating. The nominal voltage and equipment’s maximum voltage rating are distinct values; the correct ratings and coordination must be confirmed for the actual order.
For a low-voltage switchboard, a project may call for a particular main-device arrangement, feeder count, device frame sizes, metering, or provisions for future circuits. Medium-voltage applications require a different equipment and engineering basis; UL 891 applies to low-voltage switchboards and should not be treated as a general medium-voltage switchgear approval. Ratings, applicable standards, component availability, and any required U.S.-origin content need project-specific confirmation.
Fit, access, and connections are design choices
Physical customization can address the available electrical-room footprint, lineup arrangement, cable-entry direction, and the locations of conduits or bus connections. A requested overall dimension alone is not enough: cable bending space, working clearances, access to operating handles, ventilation, lifting and rigging paths, and the building’s route to the installation location can all affect whether the layout is workable. Send dimensioned room drawings and identify fixed obstacles rather than relying on a rough equipment-space estimate.
Connection details deserve equal attention. The design team needs to understand conductor type and size, termination requirements, bus interfaces, grounding and bonding expectations, and any connections to transformers, generators, transfer equipment, or downstream distribution. Changing one interface can affect compartment layout, cable space, heat management, or service access. A manufacturer should review those dependencies before treating a requested change as a simple dimensional adjustment.

Controls, metering, and operation can be tailored
Project-specific features may include metering points, control wiring, status indication, communications interfaces, and interlocks. Define what operators must monitor or control, which signals must be exchanged with a building or plant system, and the required protocols or contact behavior. Identify whether control power is available and describe the intended operating sequence. These details help distinguish a necessary function from a preferred device or brand that may not be available or suitable.
A customization can also introduce tradeoffs. Added devices and wiring may increase complexity, affect the available space, or require additional drawings, testing, and review. Interlocks and controls should reflect an approved operating philosophy and be checked against the complete system design; a feature requested in isolation can conflict with maintenance needs or protective-device coordination. Final implementation depends on engineering review and confirmation of actual manufacturing capability.
Example: adapting a lineup to a constrained room
Consider a hypothetical facility in the Dallas–Fort Worth area replacing distribution equipment in a room with limited wall space and existing cable conduits. The purchaser may request a lineup split into sections, bottom cable entry, a specific main-and-feeder arrangement, and metering that reports selected values to a supervisory system. Those are design inputs, not confirmation that a particular configuration can be supplied. The room survey, system data, and interface requirements would need review before the arrangement is accepted.
The same example illustrates why changes should be evaluated together. Bottom entry may compete with the required cable bending space; a narrower lineup may affect access or section layout; and communications requirements may call for compatible meters, wiring, and control-power arrangements. The purchaser should confirm that the proposed design fits the building route and installation clearances, while the manufacturer confirms buildability and applicable documentation. No assumed local factory or completed project is implied by serving customers in the region.
Prepare a quote package that supports review
For a useful quote, provide a single-line diagram and equipment schedule, system nominal voltage and frequency, phase and wire configuration, service conditions, available fault current, and required short-circuit performance. Include the intended application, main and feeder device requirements, metering and control functions, and any known utility or owner specifications. Clearly mark items that are mandatory, preferred, or still under review so that a proposed design does not silently substitute an assumption for a requirement.
Add room and access drawings, equipment dimensions or maximum envelope, cable-entry and connection information, environmental conditions, and details of adjacent equipment or communications interfaces. Identify requested standards, approvals, documentation, and any U.S.-origin requirements. New custom-built equipment and American components may be part of the manufacturer’s offering, and a shorter lead time may be a goal, but component availability, origin requirements, lead time, and compliance must be confirmed for the specific order rather than presumed.
Bring qualified professionals in before release
Engage the project’s qualified electrical engineer or other responsible design professional early, especially when changing protection, service-entrance arrangements, control logic, or interfaces with existing equipment. That professional can establish the electrical requirements, coordinate protective devices, and determine which code, utility, owner, and authority-having-jurisdiction approvals apply. The manufacturer can then assess the requested build against its verified capabilities and identify open technical questions before drawings are finalized.
Before approving production, review the equipment drawings, ratings, component selections, connection details, and control interfaces against the project documents. Confirm any required UL 891 scope for a low-voltage switchboard rather than assuming every custom assembly is listed or approved. A clear review record helps prevent late changes, mismatched connections, and expectations based on features or certifications that have not been confirmed.
Specifications & planning
Review the details that matter for your application. Final specifications and availability should be confirmed for your project.
| Evaluation factor | What to provide or verify |
|---|---|
| Electrical duty | Nominal system voltage, fault-current data, and required equipment ratings; confirm by project |
| Physical fit | Dimensioned room, route, access, clearances, and cable-entry constraints |
| Interfaces | Connection details, control functions, communications, and adjacent equipment |
| Approvals and sourcing | Applicable standards, approval scope, component availability, and origin requirements |