Power distribution, with purpose.
A panelboard specification has to connect the electrical design to the circuits people will actually use. Feeder coordination, system voltage, panel rating, and branch-circuit details all affect whether the equipment fits the installation and can be reviewed efficiently. A useful starting point is an accurate one-line diagram and a circuit schedule—not a panel name or ampere rating in isolation.
Coordinate feeder protection through the distribution path
A panelboard’s incoming feeder and its overcurrent device should be considered alongside the upstream source and downstream branch devices. The designer should identify the source equipment, feeder conductors, protective-device types and settings where known, and the loads supplied by the panel. Those details allow a review of interrupting and short-circuit requirements, selective coordination objectives, and any applicable project criteria. A panelboard rating alone does not establish that the complete protective scheme is coordinated.
Selective coordination can affect device selection, settings, and the time-current relationship between upstream and downstream protection. Where the project requires it, provide the coordination study or design basis and identify which systems or circuits are in scope. If settings or upstream equipment are not yet finalized, flag that uncertainty rather than treating assumed values as confirmed. Final device combinations and ratings require engineering review against the actual system and applicable requirements.
Define voltage, phase, and wiring configuration precisely
State the nominal system voltage, phase, frequency, and number of wires, and clarify whether the panel is fed from a grounded wye, delta, or another configuration. For example, a 480Y/277 V system has different line-to-line and line-to-neutral voltages; the branch loads and connected equipment determine which are needed. Also identify the grounding and neutral arrangement and whether a neutral conductor or neutral bus is required. A voltage label without its configuration can leave important compatibility questions unanswered.
Distinguish nominal system voltage from the equipment’s maximum voltage rating. Confirm the supply arrangement, grounding method, and any project-specific voltage tolerances with the electrical design team. Where a panel serves mixed loads, the schedule should show which circuits need line-to-neutral versus line-to-line power. These details matter when matching branch devices and accessories, and should be resolved before the equipment design is finalized.

Match panel rating to calculated demand and available fault current
Specify the required panel bus rating and feeder overcurrent protection based on the design, not simply the sum of breaker handle ratings. The calculation should account for applicable demand factors, continuous loads, future capacity assumptions, and any restrictions imposed by the system design. Identify the main arrangement—such as main breaker or main lugs only—and the intended feeder connection. A larger nominal bus rating does not by itself verify conductor sizing, protection, or suitability for the calculated load.
Provide the available short-circuit current at the panel location, or the design information needed to establish it, and state the required short-circuit rating basis. The selected equipment and protective-device combination must be evaluated for the system conditions; do not assume a particular rating from voltage or bus amperage alone. Ratings, component availability, standards, and any U.S.-origin requirements must be confirmed for the specific order. UL 891 applies to low-voltage switchboards, not as a general panelboard or medium-voltage rating.
Make the branch-circuit schedule buildable
A useful circuit schedule identifies each load, its phase and voltage, pole count, estimated or design load, and required breaker characteristics. Include special requirements such as GFCI or AFCI protection, shunt trips, auxiliary contacts, lockable devices, or a defined trip curve when the application calls for them. Note which circuits are spare, spaces reserved for future work, or intentionally left blank. Clear descriptions help reviewers distinguish an actual spare circuit from an unassigned load that still needs a device.
Check the schedule against the panel’s physical layout and the project’s future-use plan. Two-pole and three-pole devices occupy more positions than single-pole devices, and circuit arrangement can affect phase balance and available spaces. Identify any unusual load, sensitive equipment, or critical circuit that influences device selection. When a schedule is preliminary, mark it as such and state what remains open; a polished but incomplete schedule can conceal late changes that affect the build.
Resolve installation interfaces before releasing the design
The enclosure and connection details need to match the intended location and wiring approach. Supply the indoor or outdoor application, environmental conditions, mounting orientation, access constraints, cable or conduit entry direction, and any enclosure requirements specified by the project. Clarify whether conductors enter from above or below and provide available space or layout constraints where known. These interfaces can affect enclosure selection, terminal arrangement, and the practicality of landing feeder and branch conductors.
Identify the upstream source and downstream equipment, including feeder direction, connection method, and any required metering or control interfaces. If the panel must align with adjacent gear or fit an existing electrical room layout, provide drawings and dimensions rather than relying on a general description. For a Dallas–Fort Worth project or a shipment elsewhere in the United States, accurate delivery and site constraints help plan the equipment handoff; they do not imply a local manufacturing or installation service.
Prepare a complete request for a new panelboard
For a quote, provide the one-line diagram, panel schedule, nominal system voltage and configuration, bus and main-device requirements, available fault current, and the coordination or short-circuit study information available. Include enclosure and mounting requirements, connection details, metering or accessory needs, project specifications, and any applicable U.S.-origin criteria. Mark deviations, unresolved design items, and requested alternates explicitly. This gives the manufacturer a sound basis to review scope and identify questions before the design advances.
The manufacturer builds and supplies new equipment and can consider custom requirements, American components where suitable and available, and shorter lead time as a goal—not a guaranteed delivery date. A request should identify the required ship-to location and target schedule so feasibility can be reviewed against the actual design and component availability. Final ratings, standards, component selections, and compliance requirements are confirmed for each order. An early, complete submittal is more useful than assuming a standard panel will match the feeder and branch-circuit design.
Specifications & planning
Review the details that matter for your application. Final specifications and availability should be confirmed for your project.
| Evaluation factor | Information to confirm |
|---|---|
| Feeder coordination | Upstream and downstream devices, design settings, and project coordination criteria |
| Voltage and configuration | Nominal voltage, phase, frequency, wires, grounding, and neutral needs |
| Panel rating | Calculated demand, bus and main arrangement, and available fault current |
| Branch circuits | Load schedule, poles, device features, spares, and reserved spaces |
