34.5 kV Switchgear Specification Guide

Plan a 34.5 kV distribution specification with clear grounding, voltage, insulation, protection, and service-interface requirements.

MADE IN USAAmerican components
UL 891Switchboard assemblies
SHORT LEAD TIMESConfirm your project schedule
BUILT FOR YOUR PROJECT

Power distribution, with purpose.

A 34.5 kV system specification starts with more than a voltage label: the system arrangement, grounding method, fault duty, insulation coordination, and connected equipment all shape the required switchgear. Use this guide to define those interfaces before requesting a quote. A particular 34.5 kV configuration must be confirmed as available before treating it as a product offering.

Define the system voltage and phase arrangement

In this context, 34.5 kV usually identifies the nominal line-to-line voltage of a three-phase distribution system. It is not, by itself, the equipment’s maximum voltage rating or a complete description of the system. State the nominal voltage, frequency, number of phases and wires, and whether the installation is grounded or ungrounded. The selected equipment rating must be suitable for the actual system and operating conditions; have the project engineer confirm the applicable voltage class and rating.

For a grounded three-phase wye system, line-to-neutral voltage is approximately 34.5 kV divided by the square root of three, or 19.9 kV. That relationship does not mean the switchgear should be specified using the line-to-neutral value alone. For delta systems, the available neutral and voltage relationships differ. Identify which conductors are brought to the gear, how voltage transformers or sensors will be connected, and what voltages protection and metering devices must measure.

Specify grounding and ground-fault behavior

Grounding affects temporary overvoltages, ground-fault current, relay settings, and the insulation stresses equipment may experience. Describe the source grounding arrangement, including whether it is solidly grounded, resistance grounded, reactance grounded, or ungrounded, and provide the grounding-transformer or neutral-grounding-resistor details where applicable. Include the permitted ground-fault current and duration, plus any operating restrictions imposed by the system design.

Do not assume that a grounding method can be inferred from the 34.5 kV nominal voltage. Provide the utility or facility grounding study, grounding diagram, and relay philosophy when available. If multiple sources, transformers, or ties can change the grounding path, show normal and alternate configurations. Engineering review should resolve how ground-fault detection, trip logic, and equipment insulation coordinate for each permitted operating state.

Illustrative close-up of copper busbars in a motor control panel
Illustrative industry photograph · ToT89 / Wikimedia Commons · resized · CC BY-SA 4.0

Match equipment rating and insulation to system conditions

The nominal system voltage and the switchgear’s rated maximum voltage are related but distinct values. The specification should identify the required equipment voltage class and applicable insulation levels rather than treating “34.5 kV” as a sufficient rating statement. Confirm power-frequency withstand and impulse withstand requirements against the system study, altitude, installation environment, and governing standards for the intended equipment type. Ratings and standards must be confirmed for the specific order.

Surge arresters, cable terminations, bus insulation, instrument transformers, and connected transformer windings should be evaluated as an insulation-coordination set. Provide cable type and shield details, termination style, expected surge exposure, and any altitude or contamination conditions that affect selection. A mismatch at an interface can constrain the system even when the switchgear’s headline voltage rating appears appropriate. Require the responsible engineer to review clearances and insulation requirements.

Coordinate interrupting duty and protection

A 34.5 kV nominal voltage does not establish the available fault current. Supply the calculated three-phase and line-to-ground fault duties at the proposed connection point, the source X/R ratio where available, and the required interrupting and short-time withstand duties. Include future utility changes or planned generation that could increase fault levels. Confirm breaker, bus, grounding, and protective-device capabilities together; each rating and component selection is order-specific.

Protection requirements should describe CT ratios and accuracy needs, relay functions, trip and close control voltages, communications protocols, and interfaces to upstream and downstream devices. Provide coordination curves or the study basis, including transformer inrush and motor starting where relevant. State whether differential, directional, ground-fault, or transfer-trip functions are required. Settings and schemes need engineering coordination; a supplier should not infer them solely from a voltage designation.

Plan service interfaces, access, and operating conditions

Show the one-line diagram and identify incoming and outgoing circuits, bus arrangements, normally open ties, metering points, and provisions for future feeders. Specify cable entry direction, cable quantities and sizes, termination requirements, phase sequence, control wiring, and available space for bending and termination. Identify indoor or outdoor service, ambient conditions, elevation, enclosure requirements, and any seismic or environmental criteria that apply to the site.

For a project in Dallas–Fort Worth or elsewhere, delivery planning depends on the site route, unloading capability, access openings, and any limits on shipping dimensions or weight. Provide the intended receiving location and handling constraints without assuming a local factory or installation service. Clarify commissioning boundaries, documentation, drawings, spare parts, and required coordination with the site’s electrical contractor or engineer; scope must be agreed for the order.

Prepare a quote package and verify the configuration

A useful quote request includes the one-line diagram, system voltage and grounding data, frequency, fault study, protection and metering requirements, cable and termination schedule, environmental conditions, and applicable project standards. Add preferred lineup arrangement, shipping constraints, requested delivery window, and any domestic-content or U.S.-origin requirements. Those requirements, component availability, and standards compliance must be reviewed for the specific configuration.

The manufacturer builds and supplies new equipment, including custom configurations subject to engineering and component availability. Ask explicitly whether the requested 34.5 kV arrangement is offered before making a product assumption; do not infer availability from a general voltage category. If an applicable low-voltage section is part of a broader lineup, UL 891 applies to low-voltage switchboards, not medium-voltage 34.5 kV switchgear. Shorter lead time may be a goal, not a guarantee, and depends on the final design and order.

PROJECT CONSIDERATIONS

Specifications & planning

Review the details that matter for your application. Final specifications and availability should be confirmed for your project.

34.5 kV voltage planning: specifications and planning considerations
Evaluation factorInformation to confirm
System voltageNominal line-to-line voltage, phase arrangement, frequency, and equipment voltage rating
GroundingGrounding method, ground-fault current, and permitted duration
Fault dutyAvailable fault current, X/R basis, and required interrupting and withstand duties
Insulation and interfacesInsulation levels, cable terminations, altitude, and environmental conditions; subject to engineering review
READY TO DISCUSS YOUR PROJECT?Let's build what's next.
Call (951) 403-5738
LET'S GET TO WORK

Power your next project
with confidence.

Talk through your switchgear and power distribution needs with our team.

Call (951) 403-5738
Request a Quote