Power distribution, with purpose.
A 35 kV switchgear specification must distinguish the power system’s nominal voltage from the equipment’s maximum voltage rating. That distinction shapes insulation selection, clearances, switching duties, and how the assembly connects to the rest of the installation. Define the actual system conditions first; do not treat “35 kV” alone as a complete equipment specification.
Define the system voltage and equipment class separately
Nominal voltage describes the system designation, while an equipment voltage class and maximum rating describe the limits for which the selected apparatus is designed. A system referred to as 35 kV therefore does not, by itself, establish the required maximum equipment rating. The purchaser’s engineer should identify the nominal system voltage, highest operating voltage, grounding method, frequency, and any expected voltage variation, then confirm the applicable equipment class against the project’s governing requirements.
This distinction matters at procurement because equipment terms are not interchangeable across voltage ranges. In this context, 35 kV is a medium-voltage class, not a low-voltage UL 891 switchboard rating. State the required voltage class explicitly and request confirmation of the proposed equipment’s maximum voltage and applicable standards. The manufacturer must verify ratings and standards for the specific order rather than infer them from a short product label.
Specify insulation for actual service conditions
Insulation coordination involves more than choosing a nominal voltage. The specification should identify required power-frequency withstand and impulse withstand levels where applicable, along with the system grounding arrangement and any project criteria for temporary overvoltages. These inputs help the responsible engineer evaluate phase-to-phase and phase-to-ground insulation requirements and coordinate the switchgear with connected cables, transformers, and surge-protective devices.
Installation conditions can affect the insulation design basis. Indoor or outdoor exposure, altitude, humidity, contamination, condensation risk, and enclosure arrangement may influence clearances, materials, heaters, or other design details. A purchaser should provide site conditions rather than assume a standard environment. If equipment will operate above a relevant altitude or in a harsh atmosphere, identify that early so engineering review can determine whether adjustments are needed.

Document fault duty and switching responsibilities
A voltage rating does not establish the assembly’s ability to withstand or interrupt fault current. Provide the available short-circuit current at the switchgear location, the expected duration or clearing basis, and the protective-device coordination assumptions. Also identify whether the project requires particular momentary, short-time withstand, interrupting, or peak withstand capabilities. Those values must be reviewed together; a single fault-current number may not describe every duty imposed on the equipment.
Describe the switching functions, operating sequence, and protection scheme that the lineup must support. Incoming and feeder arrangements, bus ties, transfer logic, metering, relaying, and interlocking can affect the configuration and interfaces. Share one-line diagrams and protection requirements for review, and distinguish firm project requirements from preferences. The selected interrupting devices and their ratings must be confirmed for the actual system and order.
Resolve cable, grounding, and control interfaces
Cable termination details can determine compartment dimensions and lineup layout. Supply cable type and conductor size, number of cables per phase, entry direction, termination style, shield treatment, and any required space for stress-control components. Identify incoming and outgoing connection points and the equipment they mate with. These details help prevent late changes when switchgear must fit an existing electrical room or connect to specified transformers and cables.
Grounding and control interfaces deserve the same attention as primary connections. State the grounding philosophy, grounding conductor requirements, control power source and voltage, remote signals, communications protocol, and required terminal provisions. Include environmental and access constraints for the installation space. For projects in Dallas–Fort Worth or elsewhere, site-specific drawings and delivery constraints should be supplied for review; serving a region does not imply a local manufacturing or installation facility.
Build a quote package around verifiable requirements
A useful request for quote includes the one-line diagram, load and feeder schedule, nominal and highest system voltage, grounding method, fault study or available fault duty, protection requirements, and applicable project specifications. Add insulation criteria, site conditions, cable and termination data, control schematics, desired lineup dimensions, and required documentation. Identify the governing standards and any U.S.-origin or component requirements, since availability and compliance must be checked for the particular order.
A manufacturer can use this information to evaluate a custom new-equipment build and identify open engineering questions before the design is finalized. American components can be considered where appropriate, subject to confirmed availability and project requirements. A shorter lead time may be a goal, not a guarantee; configuration, component availability, review cycles, and standards requirements affect the schedule. Confirm ratings, scope, and delivery expectations in the order documents.
Specifications & planning
Review the details that matter for your application. Final specifications and availability should be confirmed for your project.
| Evaluation factor | Information to establish |
|---|---|
| System voltage | Nominal voltage, highest operating voltage, frequency, and grounding method |
| Insulation basis | Required withstand criteria and relevant site conditions, subject to engineering review |
| Fault duty | Available current, clearing basis, and required withstand and interrupting duties |
| Interfaces | Cable terminations, control power, protection signals, and connected equipment |