A 7.2 kV specification starts with the system, not a catalog label. Define what 7.2 kV means at the point of connection, then coordinate grounding, equipment ratings, protection, insulation, frequency, and connected loads. Confirm that the exact configuration is available before describing it as an offered product; a nominal system voltage alone does not establish a suitable switchgear rating.
Separate nominal system voltage from equipment rating
In a three-phase system, 7.2 kV commonly denotes nominal line-to-line voltage: the voltage measured between any two phase conductors. It does not, by itself, state the maximum system voltage for which equipment must be designed. The specification should identify the nominal voltage and the applicable equipment voltage class or maximum rating, using the project’s governing utility, engineering, and standards requirements. Confirm the required rating for the specific order rather than inferring it from the 7.2 kV label.
Line-to-neutral voltage is a different quantity and applies when a neutral reference is present. For a balanced, grounded wye system at 7.2 kV line-to-line, the calculated phase-to-neutral voltage is approximately 4.16 kV. That relationship is not a substitute for confirming the actual transformer winding connection, grounding method, or system configuration. Delta systems, ungrounded systems, and systems with grounding transformers may not provide a usable neutral in the same way.
Document grounding and ground-fault behavior
Grounding affects fault current, temporary overvoltage, relay response, and the voltage that insulation may experience during a ground fault. State whether the system is solidly grounded, resistance grounded, reactance grounded, or ungrounded, and provide the grounding equipment details where applicable. Include the ground-fault current limit and duration for a resistance-grounded design; those values influence protection settings and equipment duty.
The switchgear specification should explain how ground faults are detected and cleared, including the intended sensing method and trip philosophy. Coordinate neutral grounding devices, ground sensors, protective relays, and upstream protection as a system. Do not assume that a 7.2 kV designation establishes the grounding arrangement or that one relay scheme suits every installation. Have the responsible engineer confirm the grounding design and fault-clearing assumptions.

Coordinate frequency, insulation, and environmental duty
State system frequency explicitly, ordinarily 60 Hz for U.S. applications, and identify any unusual operating conditions such as frequency variation, harmonics, altitude, ambient temperature, humidity, contamination, or seismic requirements. These conditions can affect insulation coordination, thermal performance, component selection, and enclosure design. Provide the site conditions and applicable design criteria rather than relying on a generic indoor or outdoor description.
Insulation selection must account for the system’s maximum voltage, grounding, expected switching and lightning surges, and the protective devices that limit those surges. Specify the required insulation levels and test criteria from the project’s applicable standards and engineering basis. Ask the manufacturer to confirm how the proposed design addresses those requirements for the exact configuration. Neither nominal voltage nor a general product-family description proves that a particular assembly meets a project’s insulation needs.
Set protection and short-circuit requirements together
Provide available short-circuit current at the switchgear connection point, including the source assumptions and any utility data used to calculate it. Specify the required interrupting and withstand duties, protective-device types, relay functions, instrument-transformer requirements, and coordination study basis. These are related but distinct selection inputs: the source fault level, device capability, and assembly withstand rating all need to be checked for the proposed arrangement.
Protection should coordinate with upstream devices, downstream feeders, transformers, motors, and grounding equipment. Supply relevant equipment data, load characteristics, motor-starting requirements, and existing relay settings when available. Identify whether the project calls for arc-flash mitigation features or particular trip functions, then have the design reviewed by qualified engineering personnel. Do not select settings from nominal voltage alone or treat a short-circuit rating as a complete protection design.
Define service interfaces and operating constraints
A useful inquiry describes the incoming source, bus arrangement, feeder count, cable or bus connections, metering, control power, communications, and required interlocks. Clarify whether the lineup must interface with transformers, generators, utility equipment, or existing switchgear, and provide drawings or verified interface dimensions when available. Also state access, maintenance, environmental, and operating constraints that could affect compartment layout or the sequence of equipment.
For a Dallas–Fort Worth project or a destination elsewhere in the United States, shipment planning depends on the specified configuration, handling limits, delivery conditions, and site access. Identify the delivery location and any constraints such as receiving hours, unloading responsibility, or restricted routes. A manufacturer can evaluate a custom build and work toward a shorter lead time, but timing and component availability must be confirmed for the order; delivery or installation services should not be assumed.
Prepare a quote package and verify the exact build
For a useful quote, provide the one-line diagram, nominal and maximum system voltage requirements, grounding method, frequency, available fault current, protection and relay requirements, load schedule, equipment interfaces, environmental conditions, and applicable project specifications. Include requested quantities, preferred delivery timing, destination, and any required U.S.-origin provisions. Call out open engineering decisions so they can be resolved before a configuration is treated as final.
The manufacturer builds and supplies new equipment, including custom configurations using American components where specified; component origin and availability must be confirmed for the particular order. Ask for confirmation that the requested 7.2 kV configuration is actually offered and suitable for the project. Ratings, standards, short-circuit capability, and any origin requirements require order-specific review. UL 891 applies to low-voltage switchboards, not as a general listing for medium-voltage switchgear, so it should not be used to characterize a 7.2 kV assembly.
Specifications & planning
Review the details that matter for your application. Final specifications and availability should be confirmed for your project.
| Evaluation factor | Information to confirm |
|---|---|
| System voltage | Nominal line-to-line voltage and required equipment maximum rating |
| Grounding | Grounding method, neutral arrangement, and ground-fault current and duration |
| System duty | Frequency, available fault current, and required interrupting and withstand duties |
| Insulation and site | Required insulation criteria, environmental conditions, and applicable standards |